Reference list

Xergi turnkey deliveries - Biogas plants

 

biogasanlaeg
Under construction 2017
Nature Energy Videbæk, Denmark
Turnkey biogas plant for treatment of animal slurry, industrial
waste and dairy waste of a total of 530.000 ton/year.
Digester sizes: 3 x 9,500 m³ (primary digesters) and 2 x 9,500 m³ 
(secondary digesters). Annual production is expected to be
16.8 mill/Nm3 biomethane, which is pipelined directly to nearby ARLA dairy as biogas.
   
biogasanlaeg
Under construction 2016
Brigg Lane, Bonby, UK
Turnkey biogas plant for treatment of food waste.
Digester sizes: 2 x 6,300 m3 (primary) +  4,500 m3 (secondary)
Engine: Jenbacher 312 (635 kWe)
Annual production is expected to be around 7 mill/Nm3 bio-methane (gas upgrading)
   
biogasanlaeg
Under construction 2016
Ballymena, UK
Turnkey biogas plant for treatment of poultry litter.
The project includes nitrogen removal with Xergi’s patented NiX® technology.
Digester sizes: 2 x 5,200 m3 (primary) and 2 x 4,500 m3 (secondary) 
Engines: 2 x Jenbacher 420 (3 MW)
 
   
Beeswax feb 2016 130x98px

2014-16
Beeswax Farming, UK
Turnkey biogas plant for treatment of maize and grass silage.
Digester sizes: 2 x 3,000 m3 (primary) and 3,000 m3 (secondary).
Engines: 2 x Jenbacher 420 (3 MW)

   
Methelec 130x98px 2014-16
Methelec, France
Turnkey biogas plant for treatment of industrial and agricultural waste.
Digester sizes: 2 x 2,000 m³ (primary) and 4,000 m³ (secondary)
Energy output: 1.5 MWe
   
Willen 130x98px 2014-16
Willen Biogas, UK
Turnkey biogas plant (EPC contract) for treatment of municipal, industrial, household and canteen waste.
Digester sizes: 1 x 3,000 m³ (primary) and 2,000 m³ (secondary)
Energy output: 1.5 MWe
   
Midtfyn 130x98px 2014-16
Nature Energy Midtfyn, Denmark
Turnkey biogas plant for treatment of animal slurry and industrial waste of a total of 402.000 ton/year.
Digester sizes: 2 x 8,500 m³ (primary digesters) and 1 x 7,500 m³ (secondary digester).
Annual production is expected to be 12 mill/Nm3 bio-methane (gas upgrading).
   
nature energy nordfyn drone 130x98px

2014-16
Nature Energy Nordfyn, Denmark
Turnkey biogas plant for treatment of animal slurry and industrial waste of a total of 346.000 ton/year.
Digester sizes: 2 x 7,500 m³ (primary digesters) and 1 x 7,500 m³ (secondary digester).
Annual production is expected to be 9,4 mill/Nm3 bio-methane (gas upgrading).

   
Holsted 130x98px

2014-15
Nature Energy Holsted, Denmark
Turnkey biogas plant for treatment of animal slurry and industrial waste of a total of 395.000 ton/year.
Digester sizes: 2 x 7,500 m³ (primary digesters) and 2 x 7,500 m³ and 4,500 m³ (secondary digesters). Annual production is expected to be 12 mill/Nm3 bio-methane (gas upgrading).

   
Sofielund 130x98px 2014-15
Sodertorn, Sweden
Turnkey biogas plant for treatment of food waste and slurry.
Digester sizes: 9,000 m³ (primary) and 2,500 m³ (secondary) 
Energy output: 8 mill. m³ bio-methane (gas upgrading)
   
Methalandes 130x98px 2014-15
Methalandes, France
Turnkey biogas plant for treatment of industrial and agricultural waste.
Digester sizes: 15,000 m³ (primary) and 7,000 m³ (secondary)
Energy output: 4.5 MWe 
   
Vegger 130x98px 2014
Vegger, Denmark
New turnkey biogas plant for treatment of slurry, industrial waste and deep litter. Complete X-chopper® system installed. Existing biogas plant to be upgraded with new control system and integrated in the new plant.
Digester sizes: 4,000 m³ (primary) and 3,000 m³ (secondary) 
Energy output: approx. 1.5 MWe 
Most of the biogas to be delivered to nearby Arla dairy.
   
wrangle ext 130x98px 2014
Staples Vegetables, Wrangle, UK
Existing biogas plant upgraded with expanded feeding system and 2 new gas Jenbacher engines of 1.5 and 0.5 MWe
   
labat 130x98px

2013-14
Labat, France
Turnkey biogas plant for treatment of industrial waste, sludge and slurry.
Digester sizes: 1,500 m³ (primary) and 3,000 m³ (secondary)
Engine: Caterpillar 525 kWe

   
Retford 130x98px  2013-14
Retford, Tamar Energy, UK
Turnkey biogas plant with NiX technology for poultry manure, as well as vegetable waste and maize silage.
Size of digesters: 12,000 m3 (primary digesters), 4,000 m3 (secondary digester)
Energy output: 3 MWe
   
holbeach 130x98px  2013-14
Holbeach, Tamar Energy, UK
Turnkey biogas plant for vegetable waste and maize silage.
Size of digesters: 3,500 m3 (primary digester), 1,500 m3 (secondary digester)
Energy output: 1.5 MWe
   
marnay 130x98px 2013-14
Marnay, Frankrig
Turnkey biogas plant for waste from wine production, vegetable waste, maize silage and deep litter.
Digester sizes: 3,000 m3 (primary) and 2,000 m3 (secondary)
Engine: Jenbacher 1067 kWe
   
Holton 130x98px 2012-13
Holton Renewable Energy, UK
Turnkey biogas plant for waste from a turkey processing plant.
Digester sizes: 2,500 m3 (primary) and 2,500 m3 (secondary)
Engine: Jenbacher 499 kWe
   
sibsey 130x98px 2012-13
Staples Vegetables, Sibsey, UK
Turnkey biogas plant for vegetable waste and maize silage.
Digester sizes: 4,000 m3 (primary) and 4,000 m3 (secondary)
Engines: Jenbacher 500 kW + 1500 kWe
   
wrangle ext 130x98px 2012
Staples Vegetables, Wrangle, UK
Extension of existing biogas plant with new primary digester of 3,800 m3 and gas engine of 1,560 kWe
   
tiper 2012-13 
Tiper, France
Turnkey biogas plant for treatment of manure, dung, cat. 2 and 3 industrial waste and straw.
Digester size: 12,500 m3 (primary and secondary digesters)
Engine: Jenbacher 2,134 kWe
   
hometown bioenergy 130x98px 2012-13
Hometown BioEnergy, Minnesota Municipal Power Agency, USA
Biogas plant for treatment of industrial waste and manure.
Digester size: 18,000 m3 (primary and secondary digesters)
Engine: Cummins QSV 91, 8,000 kWe
   
2011-2012
Faculty of Agricultural Sciences, University of Aarhus, Foulum, Denmark
Existing plant upgraded with new solid intake and pre-treatment system including control system. Designed for biomasses of straw.
   
Meta Bio 130x98px 2011-12
Meta-Bio Energies, France
Turnkey biogas plant for treatment of organic waste.
Size of digester tanks: 5,500 m3 (primary and secondary digester)
Engine: Jenbacher 1063 kWe
   
bro gotland 3

2011
Brogas, Sweden

Turnkey biogas plant for treatment of animal slurry and industrial waste. Size of digester tanks: 4,500 m3 (primary digester) and 2,000 m3 (secondary digester) The biogas from the plant replaces heating oil at a nearby dairy and is upgraded to natural gas and used in a local gas network on Gotland.

   
barkip ref1 2010-2011
Scottish and Southern Energy, Barkip, UK
Turnkey biogas plant for treatment of organic waste
Size of digester tanks: 2 x 3,500 m3 (primary digesters) and 2 x 3,500 m3 (secondary digesters)
Engine: 2 x Jenbacher 320, 1063 kWe
   
staples ref1

2009-2010
Staples Vegetables, UK

Turnkey biogas plant for treatment of vegetable waste and maize silage Digester size: 4,000 m3 (primary and secondary digesters) Engine: Jenbacher 1.4 MWe

   
Groengas

2009
Grøngas, Denmark
Existing biogas plant upgraded with larger CHP module and new decanter centrifuge plant.
Decanter: GEA 10m3/h
Engine: Jenbacher 1.4 MWe

   
Dudendorf 130x98px 2008-09
Dudendorf, Germany
Turnkey biogas plant for treatment of animal slurry and energy crops
Digester size: 3,000 m3 (primary digester), 2,600 m3 (secondary digester) Engine: Deutz 500 kWe
   
ieper ref1

2008-09
Ieper Belgium

Turnkey biogas plant for treatment of animal slurry and industrial waste of a total of 120,000 tons/yearSize of digestion tanks: 8,000 m3 (primary digester), 2,400 m3 (secondary digester) Engines: 3 x Jenbacher 320 (3.2 MWe

   
Huckabay Ridge

2006-07
Huckabay Ridge, Texas, USA
Complete biogas plant with biogas converted into natural gas and supplied to the natural gas distribution network. Size of digesters: 28,000 m3 Maximum manure capacity: 650,000 tons/year

   
veendam

2006-07:
Veendam Biogas, Holland
Supply of equipment for biogas plant for treatment of manure and energy crops. Including gas system and SCADA system. Size of digestion tank: 4,000 m3. Engines: 5 x Jenbacher 320 (5.2 MWe in total)

   
foulum ref1

2006-07
Faculty of Agricultral Sciences, University of Aarhus, Foulum, Denmark
Complete full-scale biogas plant including gas transmission line and gas engine. In addition, delivery of a biogas test plant with 4 small biogas digesters. Size of digestion tank: Full-scale plant 1,200 m3, test plant 2 x 30 m³ and 2 x 10 m³. Engine: Jenbacher 312, 625 kW

   
quarnbek 130x98px

2006
Quarnbek Biogas Plant, Kiel, Germany
Complete biogas plant for manure and energy crops. Size of digestion tank: 1.500 m³ (primary digester), 3.000 m³ (secondary digester) Engine: Deutz 530 kW

   
Pilegaarden

2005-06
Pilegaardens Biogasanlæg, Kerteminde, Denmark
Rebuilding and upgrading of existing biogas plant. Size of digestion tank: 3 x 200 m3 Engine: Jenbacher 312

   
baanlev 2

2005-06
Bånlev Biogas, Aarhus, Denmark
Rebuilding and operation of existing biogas plant 

   
emerald irish pork

2005
Emerald Irish Pork, Brandenburg, Germany

Complete biogas plant for pig manure and energy crops. Utilisation of gas in existing CHP (2*250 kWe Deutz) Size of digestion tank: 2,000 m3

   
norswiss

2005
Norswiss Dairy, Wisconsin, USA
Complete farm biogas plant with CHP module. Size of digestion tank: 2,775 m3 Engine: Jenbacher

   
Wild Rose

2005
Wild Rose Dairy, Wisconsin, USA
Complete farm biogas plant with CHP module. Size of digestion tank: 2,775 m3 Engine: Waukesha 775 kWe

   
five star

2004
Five Star, Wisconsin, USA

Complete farm biogas plant with CHP module. Size of digestion tank: 2,775 m3 Engine: Waukesha 775 kWe

   
 

2002
Rønge Biogasanlæg, Ulstrup, Denmark

Complete containerized farm biogas plant with CHP module. Size of digestion tank: 1,300 m3 Engine: Jenbacher 511 kW

   
 

2002
Skovbækgård biogas, Holsted, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: 1,200 m3 Engine: Deutz 626 kW

 

2002
Rønnovsholm Biogas, Hjørring, Denmark
Complete farm biogas plant with CHP module. Size of digestion tank: 1,100 m3 Engine: Deutz 626 kW

   
 

2002
Refsgård Biogas, Volling, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: 400 m3 Engine: MTU 240 kW

   
2b 2002
2B Biogas, Gærum, Denmark
Complete farm biogas plant with CHP module and decanter separator.
Size of digestion tank: 800 m3
Engine: Deutz 469 kW
   
 

2002
Baunsgaard Biogas, Lihme, Denmark

Complete farm biogas plant with CHP module. Pipeline transport of manure. Size of digestion tank: 1,000 m3 Engine: Deutz 469 kWe

   
Groengas 2001-02
Grøngas A/S, Hjørring, Denmark
Complete farm biogas plant with CHP module. Heat treatment and mixing module installed in 2003.
Size of digestion tank: 1,300 m3
Engine: Deutz 626 kWe
   
 

2001
Alviksgårdens Biogas, Luleå, Sweden
Complete farm biogas plant with CHP module and heat treatment equipment for slaughterhouse waste. Size of digestion tank: 1,500 m3 Engine: Deutz 626 kW 

   
 

2001
Lynggaard Biogas, Præstø, Denmark

Complete farm biogas plant with CHP module and decanter separator. Size of digestion tank: 1,100 m3 Engine: Jenbacher 625 kWe

   
 

2001
Rybjerg Biogas, Roslev, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: 800 m3. Engine: Jenbacher 511 kWe

   
 

2001
Skærbæk Biogasanlæg, Skærbæk, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: m3. Engine: Jenbacher 500 kWe

   
 

2001
Allégården Biogas, Odense, Denmark

Complete farm biogas plant with CHP module. Engine: Jenbacher 240 kW

   
 

2001
Øksenvad Biogasanlæg, Skive, Denmark

Complete farm biogas plant with CHP module. Engine: MTU 240 kWe

   
 

2001
Hjøllund Biogas, Ringkøbing, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: 800 m3. Engine: Jenbacher 511 kW

   
 

2001
Lundgård Biogas, Rødekro, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: Jenbacher 330 kW

   
 

2000
Tinggaard Biogas, Bedsted, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3. Engine: Jenbacher 300 kW

   
 

2000
Nimtofte Biogasanlæg, Nimtofte, Denmark
Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: MAN 340 kW 

   
 

2000
Bording Biogasanlæg, Bording, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: MAN 400 kW - dual fuel

   
 

2000
Uhrenholtgaard Biogasanlæg, Hadsund, Denmark

Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: MAN 350 kW - dual fuel

   
 

2000
Nordjysk Minkfoder, Hvims, Danmark
Komplet gårdbiogasanlæg med kraftvarmemodul.
Reaktorstørrelse: 800 m³
Motor: Jenbacher 511 kWel

   
 

2001
Hegndal Biogasanlæg, Sdr. Vium, Denmark

Complete farm biogas plant with CHP module. Equipped with decanter separator and evaporator for full separation in 2001. Size of digestion tank: 800 m3 Engine: MAN 400 kW - dual fuel + Jenbacher 223 kW

   
 

1999
Spøttrup Biogasanlæg, Spøttrup, Denmark

Complete farm biogas plant with CHP module. Engine: Caterpillar 90 kW

   
 

1998
Fly Biogas, Skive, Denmark

Complete farm biogas plant with CHP module. Engine: Caterpillar

   
 

1998
Brunshøjgaard Biogasanlæg, Boddum, Denmark
Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3

   
 

1996-97
Studsgård Biogasanlæg, Studsgård, Denmark
Complete biogas plant, established with DDH as a consultant. Size of digestion tank: 2 x 3,000 m3 

   
 

1992-93
Lemvig Kraftvarme A/S, Denmark

Biogas fired CHP station, building, chimney, gas compression plant and SCADA system. Engine: Ulstein Bergen KVGS 12G (2.0 MW)

   
 

1993
Vaarst-Fjellerad Kraftvarmeværk A.m.b.a., Denmark

Natural gas/biogas fired CHP station, building, complete district heating central with gas boiler, main pumps and chimney, 500 m³ heat storage tank and SCADA system.
Engine: Ulstein Bergen KVGS 12 (2.0 MW)

   
 

1993
Hashøj Kraftvarmeforsyning A.m.b.a., Denmark
N
Natural gas/biogas fired CHP station, building, complete district heating central with gas boiler, main pumps and chimney, 600 m³ heat storage tank and SCADA system. Engine: Ulstein Bergen KVGS 12G (2.0 MW) + Caterpillar 3512 SITA (0.8 MW)