2008-09: Dudendorf, Germany Turnkey biogas plant for treatment of animal slurry and energy crops Digester size: 3,000 m3 (primary digester), 2,600 m3 (secondary digester) Engine: Deutz 500 kWe
|
|
2008-09: Ieper Belgium Turnkey biogas plant for treatment of animal slurry and industrial waste of a total of 120,000 tons/yearSize of digestion tanks: 8,000 m3 (primary digester), 2,400 m3 (secondary digester) Engines: 3 x Jenbacher 320 (3.2 MWe)
|
 |
2006-07: Huckabay Ridge, Texas, USA Complete biogas plant with biogas converted into natural gas and supplied to the natural gas distribution network. Size of digesters: 28,000 m3 Maximum manure capacity: 650,000 tons/year
|
 |
2006-07: Veendam Biogas, Holland Supply of equipment for biogas plant for treatment of manure and energy crops. Including gas system and SCADA system. Size of digestion tank: 4,000 m3. Engines: 5 x Jenbacher 320 (5.2 MWe in total)
|
 |
2006-07: Faculty of Agricultral Sciences, University of Aarhus, Foulum, Denmark Complete full-scale biogas plant including gas transmission line and gas engine. In addition, delivery of a biogas test plant with 4 small biogas digesters. Size of digestion tank: Full-scale plant 1,200 m3, test plant 2 x 30 m³ and 2 x 10 m³. Engine: Jenbacher 312, 625 kW
|
 |
2006: Quarnbek Biogas Plant, Kiel, Germany Complete biogas plant for manure and energy crops. Size of digestion tank: 1.500 m³ (primary digester), 3.000 m³ (secondary digester) Engine: Deutz 530 kW
|
 |
2005-06: Pilegaardens Biogasanlæg, Kerteminde, Denmark Rebuilding and upgrading of existing biogas plant. Size of digestion tank: 3 x 200 m3 Engine: Jenbacher 312
|
 |
2005-06: Bånlev Biogas, Aarhus, Denmark Rebuilding and operation of existing biogas plant.
|
 |
2005: Emerald Irish Pork, Brandenburg, Germany Complete biogas plant for pig manure and energy crops. Utilisation of gas in existing CHP (2*250 kWe Deutz) Size of digestion tank: 2,000 m3
|
 |
2005: Norswiss Dairy, Wisconsin, USA Complete farm biogas plant with CHP module. Size of digestion tank: 2,775 m3 Engine: Jenbacher
|
 |
2005: Wild Rose Dairy, Wisconsin, USA Complete farm biogas plant with CHP module. Size of digestion tank: 2,775 m3 Engine: Waukesha 775 kWe
|
 |
2004: Five Star, Wisconsin, USA Complete farm biogas plant with CHP module. Size of digestion tank: 2,775 m3 Engine: Waukesha 775 kWe
|
|
2002: Rønge Biogasanlæg, Ulstrup, Denmark Complete containerized farm biogas plant with CHP module. Size of digestion tank: 1,300 m3 Engine: Jenbacher 511 kW
|
|
2002: Skovbækgård biogas, Holsted, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 1,200 m3 Engine: Deutz 626 kW
|
|
2002: Rønnovsholm Biogas, Hjørring, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 1,100 m3 Engine: Deutz 626 kW
|
|
2002: Refsgård Biogas, Volling, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 400 m3 Engine: MTU 240 kW
|
 |
2002: 2B Biogas , Gærum, Denmark Complete farm biogas plant with CHP module and decanter separator. Size of digestion tank: 800 m3 Engine: Deutz 469 kW
|
|
2002: Baunsgaard Biogas , Lihme, Denmark Complete farm biogas plant with CHP module. Pipeline transport of manure. Size of digestion tank: 1,000 m3 Engine: Deutz 469 kW
|
 |
2001-02: Grøngas A/S , Hjørring, Denmark Complete farm biogas plant with CHP module. Heat treatment and mixing module installed in 2003. Size of digestion tank: 1,300 m3 Engine: Deutz 626 kW
|
|
2001: Alviksgårdens Biogas, Luleå, Sweden Complete farm biogas plant with CHP module and heat treatment equipment for slaughterhouse waste. Size of digestion tank: 1,500 m3 Engine: Deutz 626 kW
|
|
2001: Lynggaard Biogas , Præstø, Denmark Complete farm biogas plant with CHP module and decanter separator. Size of digestion tank: 1,100 m3 Engine: Jenbacher 625 kW
|
|
2001: Rybjerg Biogas, Roslev, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 800 m3 Engine: Jenbacher 511 kW
|
|
2001: Skærbæk Biogasanlæg, Skærbæk, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: m3 Engine: Jenbacher 500 kW
|
|
2001: Allégården Biogas, Odense, Denmark Complete farm biogas plant with CHP module. Engine: Jenbacher 240 kW
|
|
2001: Øksenvad Biogasanlæg, Skive, Denmark Complete farm biogas plant with CHP module. Engine: MTU 240 kW
|
|
2001: Hjøllund Biogas, Ringkøbing, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 800 m3 Engine: Jenbacher 511 kW
|
|
2001: Lundgård Biogas, Rødekro, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: Jenbacher 330 kW
|
|
2000: Tinggaard Biogas, Bedsted, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: Jenbacher 300 kW
|
|
2000: Nimtofte Biogasanlæg, Nimtofte, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: MAN 340 kW
|
 |
2000: Bording Biogasanlæg, Bording, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: MAN 400 kW - dual fuel
|
 |
2000: Uhrenholtgaard Biogasanlæg, Hadsund, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3 Engine: MAN 350 kW - dual fuel
|
|
2000: Nordjysk Minkfoder, Hvims, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 800 m3 Engine: Jenbacher 511 kW
|
|
2001: Hegndal Biogasanlæg, Sdr. Vium, Denmark Complete farm biogas plant with CHP module. Equipped with decanter separator and evaporator for full separation in 2001. Size of digestion tank: 800 m3 Engine: MAN 400 kW - dual fuel + Jenbacher 223 kW
|
|
1999: Spøttrup Biogasanlæg, Spøttrup, Denmark Complete farm biogas plant with CHP module. Engine: Caterpillar 90 kW
|
|
1998: Fly Biogas, Skive, Denmark Complete farm biogas plant with CHP module. Engine: Caterpillar
|
|
1998: Brunshøjgaard Biogasanlæg, Boddum, Denmark Complete farm biogas plant with CHP module. Size of digestion tank: 600 m3
|
|
1996-97: Studsgård Biogasanlæg, Studsgård, Denmark Complete biogas plant, established with DDH as a consultant. Size of digestion tank: 2 x 3,000 m3
|
|
1992-93: Lemvig Kraftvarme A/S, Denmark Biogas fired CHP station, building, chimney, gas compression plant and SCADA system. Engine: Ulstein Bergen KVGS 12G (2.0 MW)
|
|
1993: Vaarst-Fjellerad Kraftvarmeværk A.m.b.a., Denmark Natural gas/biogas fired CHP station, building, complete district heating central with gas boiler, main pumps and chimney, 500 m³ heat storage tank and SCADA system. Engine: Ulstein Bergen KVGS 12 (2.0 MW)
|
|
1993: Hashøj Kraftvarmeforsyning A.m.b.a., Denmark Natural gas/biogas fired CHP station, building, complete district heating central with gas boiler, main pumps and chimney, 600 m³ heat storage tank and SCADA system. Engine: Ulstein Bergen KVGS 12G (2.0 MW) + Caterpillar 3512 SITA (0.8 MW)
|