CHP for district heating PDF Print E-mail


2006: Thameswey Central Milton Keynes Ltd., England

Natural gas fired CHP plant with 1 x Jenbacher 620, 3,047 kWe, gas fired boiler 10 MW, 3 x 160 m3 heat storage, high-voltage transmission line and district heating main to two development areas in Central Milton Keynes, supply to approx. 900 apartments, a supermarket and a number of shops.

woking0.jpg


2006: Woking, England
Extension of existing CHP-based energy plant with additional cooling system for absorption plant, high voltage transmission line, district heating/cooling main and increase of distribution capacity.
Client: Thameswey Energy Ltd.,

bronderslev.jpg


2005: Brønderslev Kraftvarme, Denmark
Extension of existing CHP plant consisting of gas boiler plant including building, 2 x 15 MW boilers, flue gas exchangers, transmission pumps, chimney, three back-up power units.

woking_park.jpg


2004: Woking Park, England
Natural gas fired CHP plant with 4 x Frichs 60 kWe replacing obsolete CHP engines
Client: Thameswey Energy Ltd., England

 


2002-03: - Woking Park, England
Natural gas fired CHP plant with 1 x Jenbacher 316, 836 kWe, 1 x ONSI PC25 fuel cell, 200 kWe, 100 m3 heat storage, high voltage transmission lines, district heating and cooling pipes between buildings (approx. 400 m), refurbishment of existing plant.
Client: Thameswey Energy Ltd.

woking-chp-u_skilt-test-1.jpg


2000: Woking Town Centre, England

Natural gas fired CHPC (Combined Heat, Power & Cooling) plant with 2 x 1.25 MW gas boilers, 1 x Deutz 620, 1.3 MWe, 160 m3 heat accumulating tank, 2 x 400 kW absorption cooling. Re-building of existing transformation building. Private wire.
Client: Thameswey Energy Ltd.

 


2000: Barkantine, Isle of Dogs, London, England
Natural gas fired CHP plant with 2 x 1.25 MW gas boilers, 1 x Deutz 620, 1.3 MWe, 2 x 105 m3 heat accumulating tank. Refurbishment of existing building.
Client: The Barkantine Heat & Power Company Ltd.


1998-99: Højby Kraftvarme, Denmark

Natural gas fired CHP plant, complete new district heating plant with 5.0 MW gas boiler, main pumps and chimney, 3 x Jenbacher JMS 320, 2.8 MWe, 1 x 800 m³ heat storage tank and CRM system with remote monitoring via an ISDN connection to NVE's main station.
Client: Nordvestsjællands Energiforsyning A.m.b.A (NVE)


1998-99: Vig Kraftvarme, Denmark

Natural gas fired CHP plant, complete new district heating plant with 4.0 MW gas boiler, main pumps and chimney, 2 x Jenbacher JMS 320, 1.8 MWe, 1 x 600 m³ heat storage tank and CRM system with remote monitoring via an ISDN connection to NVE's main station.
Client: Nordvestsjællands Energiforsyning A.m.b.A (NVE)


1997-98: Varmdrup Fjernvarme A.m.b.A., Denmark

Natural gas fired CHP station, 1 x Wärtsilä 16V25SG gas engine plant, 2.8 MWe, 1 storage tank 1,600 m³. Rebuilding of existing boiler house and stack. Integration of existing control system for industrial excess heat and a new CRM system.
Client: Vamdrup Fjernvarm A.m.b.A., Denmark


1997-98: Sandved-Tornemark A.m.b.A, Denmark

Natural gas fired CHP station, new district heating plant with gas boiler, main pumps and stack. 2 x Jenbacher JMS 320, 1.8 MWe, 1 x 800 m³ heat storage tank and CRM system.


1997-98: Decin - Zelenice, The Czech Republic

Natural gas fired CHP station, 3 x Jenbacher JMS 616, 5.1 MWe, building, complete district heating station with 2 x 5.5 MW gas boilers, main pumps, 1 x 450 m³ heat storage tank, stack and CRM system.


1996-97: Svendborg Kraftvarmeværk, Denmark
Natural gas fired CHP station, 3 x Wärtsila 18V34SG gas engine plant of 15.6 MWe, 1 x 8800 m³ heat storage tank, exhaust gas steam and heat boiler plant, exchanger station with 3 x 10 MW exchangers, high- voltage plant and CRM system.


1996: Møldrup Kraftvarmeværk A.m.b.A., Denmark

Natural gas fired CHP station, building, coupling to existing district heating station, 2 x Jenbacher JMS 320, 1.8 MWe, 3 x 103 m³ heat storage tank and CRM system.


1995: Hundslund-Oldrup Kraftvarme A.m.b.A., Denmark
Natural gas fired CHP station, complete district heating station with 1.6 MW gas boiler, main pumps and stack, 1 x Jenbacher JMS 320, 0.9 MWe, 1 x 500 m³ heat storage tank and CRM system.


1995: Halvrimmen-Arentsminde Kraftvarme A.mb.A, Dk
Extension of existing district heating station with 1 liquid filled heat storage tank 400 m³ and integration to existing system.

bronderslev.jpg


1996: Brønderslev Kraftvarme, Denmark
Natural gas fired CHP station, 7 x Ulstein Bergen KVGS 18 G, 21.4 MWe, 8000 m³ heat storage tank, pump station and CRM system.

1995-96: Jægerspris Kraftvarme A.m.b.A., Denmark
Natural gas fired CHP station, complete district heating station with gas boiler, main pumps and stack, 2 x Caterpillar 3612 SITA, 5.2 MWe, 2 x 780 m³ heat storage tank and CRM system.


1994-95: Hvalsø Kraftvarm, Denmark
Natural gas fired CHP station, new building and refurbishment of existing district heating station, 1 x Caterpillar 3612 SITA, 2.7 MWe, 1300 m³· heat storage tank and CRM system.


1994-95: Ejby Fjernvarme A.m.b.A., Denmark
Natural gas fired CHP station, building, coupling to existing district heating station, 1 x Wärtsila 16V 25 SG, 2.8 MWe, 1000 m³ heat storage tank and CRM system.

hornum.jpg


1994: Hornum Kraftvarme A.m.b.A., Denmark
Natural gas fired CHP station, building, coupling to existing district heating station, 2 x Jenbacher JMS 316, 1.3 MWe, 3 x 111 m³ heat storage tank and CRM system.

haderup.jpg


1994: Haderup Kraftvarme A.m.b.A., Denmark
Natural gas fired CHP station, complete district heating station with 1.5 MW gas boiler, main pumps and stack, 2 x Jenbacher JMS 316, 1.3 MWe, 1 x 800 m³ heat storage tank and CRM system.

feldborg.jpg


1994: Feldborg Kraftvarme A.m.b.A., Denmark
Natural gas fired CHP station, complete district heatingstation with 1.5 MW gas boiler, main pumps and stack,2 x Jenbacher JMS 316, 1.3 MWe, 1 x 800 m³ heatstorage tank and CRM system.


1994: Gedsted Kraftvarme A.m.b.A., Denmark

Natural gas fired CHP station, building, coupling to existing district heating station, 2 x Jenbacher JMS316, 1.3 MWe, 2 x 110 m³ heat storage tank and CRM system.


1994: Klejtrup Kraftvarmeanlæg A.m.b.A., Denmark

Natural gas fired CHP station, building, coupling to existing district heating station, 1 x Jenbacher JMS 320, 0.8 MWe, 1 x 204 m³ heat storage tank and CRM system.


1994: Dyssegårdsparken, Næstved, Denmark

Natural gas fired CHP station, building, coupling to and renovation of existing district heating station, 2 x Jenbacher JMS 320, 1.6 MWe, 2 x 125 m³ heat storage tank and CRM system.


1994: Farstrup-Kølby Kraftvarme A.m.b.A., Denmark

Natural gas fired CHP station, complete district heating station with 1.5 MW gas boiler, main pumps and stack, 2 x Jenbacher JMS 316, 1.3 MWe, 2 x 204 m³ heat storage tank and CRM system.


1994: Gassum-Hvidsten Kraftvarme A.m.b.A., Denmark

Natural gas fired CHP station, complete district heating station with 1.5 MW gas boiler, main pumps and stack, 2 x Jenbacher JMS 316, 1.3 MWe, 2 x 204 m³ heat storage tank and CRM system.

engesvang.jpg


1994: Engesvang-Moselund Kraftvarmeværk, Denmark
Natural gas fired CHP station prepared for biogas firing. Main pumps and stack, 1 x Ulstein Bergen KVGS 18G, 3.0 MWe, 2 x 500 m³ heat storage tank and CRM system.


1994: Dragsholm Energi Forsyning A.m.b.A., Denmark
Natural gas fired CHP station, new building, completedistrict heating station with 2.9 MW gasboiler, main pumps and stack, 1 x Ulstein Bergen,KVGS 12G, 2.0 MWe, 1 x 800 m³ heat storage tank and CRM system.


1993: Ellidshøj-Ferslev Kraftvarmeværk A.m.b.A., Denmark

Natural gas fired CHP station, new building, complete district heating station with 2.5 MW gas boiler, main pumps and stack, 1 x Ulstein Bergen KVGS 12G, 2.0 MWe, 500 m³ heat storage tank and CRM system.


1993: Sdr. Herreds Kraftvarmeværker A.m.b.A., Denmark

Four natural gas fired CHP stations for supplying 6 villages in a jointly owned operating company. The main station is equipped with 3.0 MW gas boiler and district heating station, 3 x Jenbacher JMS 316, 2 MWe, 600 m³ heat storage tank and joint operating station with remote monitoring of all stations. Three small stations with 1.0 MW gas boiler and district heating station, 1 x Jenbacher JMS 316, 2.0 MWe, 200 m³· heat storage tank and the possibility of local operation.


1993: Vaarst-Fjellerad Kraftvarmeværk A.m.b.A., Denmark

Natural gas fired CHP station, new building, complete district heating station with 2.0 MW gas boiler, main pumps and stack, 1 x Ulstein Bergen KVGS 12, 2.0 MWe, 500 m³ heat storage tank and CRM system.


1993: Hvalpsund Kraftvarme A.m.b.A., Denmark
Natural gas fired CHP station, new building, complete district heating station with 2.0 MW gas boiler, main pumps and stack, 1 x Ulstein Bergen KVGS 9G, 1.5 MWe, 525 m³ heat storage tank and CRM system.


1993: Hashøj Kraftvarmefor- syning A.m.b.A., Denmark

Natural gas/biogas fired CHP station, new building, complete district heating station with gas boiler, main pumps and stack, 1 x Ulstein Bergen KVGS 12G, 2.0 MWe, and 1 x Caterpillar 3512 SITA , 0.8 MWe, 600 m³ heat storage tank and CRM system.


1992: Nr. Nissum Kraftvarme A.m.b.A., Denmark

Natural gas fired CHP station, building, complete district heating station with 5.0 MW gas boiler, main pumps and stack, 1 x Ulstein Bergen KVG


1992: Mellerup Kraftvarme A.m.b.A., Denmark
Natural gas fired CHP plant, complete district heatingstation with 1.5 MW gas boiler, main pumps and stack,1 x Ulstein Bergen KVGS 8G, 1.3 MWe, 300 m³ heatstorage tank and CRM system.


1992-93: Lemvig Kraftvarme A/S, Denmark
Biogas fired CHP station, new building, 1 x Ulstein Bergen KVGS 12G, 2.0 MWe, 4 MW + 1 MW gasboilers, stack, gas compressor plant and CRM system.

grindsted.jpg


1992: Grindsted/Uggerhalne Kraftvarmeværk A.m.b.A., Denmark

Natural gas fired CHP station, new building,·complete district heating station with 2.0 MW gas boiler, main pumps and stack, 2 x Dorman 16 SETCWG Minor, 1.6 MWe, 530 m³ heat storage tankand CRM system.


1991-92 Langholt Energiselskab A.m.b.A., Denmark
Natural gas fired CHP station, building, complete district heating station with 2.0 MW gas boiler, main pumps and stack, 2 x Dorman 16 SETCWG Minor, 1.6 MWe, 600 m³ heat storage tank and CRM system.


1991-92: Ulbjerg Kraftvarme A.m.b.A., Denmark

Natural gas fired CHP station, complete district heating station with 1.2 MW gas boiler, main pumps and stack, 1 x Dorman 16 SETCWG Minor, 0.8 MWe, 300 m³· heat storage tank and CRM system.


1989-90: Hammer Bakker Kedelcentrail, Denmark

Natural gas CHP module, 1 x Dorman 6 SETCWG Minox, 0.3 MWe, 50 m³ heat storage tank, stack etc.


1988-89: Ærøskøbing Energiselskab A.m.b.A., Denmark

Combined plant with diesel engine/generator, 150·kWe, heat pump, straw-fired boiler 1.6 MW, heat storage tanks, energy collectors etc.


1986-87: Skovsgård Energiselskab A.m.b.A., Denmark

Combined plant with biogas engine/generator, 350kWe heat pump, heat storage tanks, gas furnace, biogas plant etc.

 

 

 
Danish(DK)French (Fr)

News

Biogas order for the UK

Xergi is to deliver a 1.4 MW anaerobic digestion plant to Staples Vegetables, Lincolnshire, UK.

Read more...
 
Grøngas has been upgraded

Grøngas A/S has had a new engine

Read more...
 

Newsletter

Type in your information, to recieve News from Xergi.



Head Office: Xergi A/S · Hermesvej 1 · 9530 Støvring · Denmark · Tel. +45 9935 1600 · mail@xergi.com

United Kingdom: Xergi Ltd. · Room 4 WBC Depot · Monument Way East · Woking · Surrey GU21 5 LY · Tel. +44 (0)1483600098 · cst@xergi.com